A lumber supplier ticket records the tally the yard counted: nominal size, tally length, piece count, and board feet. Read it in this order: confirm the product identity, check the tally fields, then recompute the board feet from the nominal dimensions with the standard formula. If the recomputed total matches the ticket, the tally checks out.
What does a supplier ticket tell you about board foot?
The ticket gives the board-foot tally for a stated nominal size, tally length, and piece count. It does not re-measure your boards, and it does not use tape-measured actual dimensions.
| Field | What it is | Why it matters |
|---|---|---|
| Nominal size | The stated size, such as 2x4 or 4/4 | Board feet are computed from this size, not from dressed dimensions |
| Tally length | Length in whole feet | Hardwood lengths are rounded down to the whole foot |
| Piece count | Number of pieces on the tally line | The multiplier for the per-piece board feet |
| Board feet | The tally total for the line | Must equal per-piece board feet times piece count |
| Species and grade | What the yard tallied | Confirms the load matches the order |
| Thickness notation | 4/4, 6/4, 8/4 on hardwood tickets | Quarters of an inch, nominal |
| Ticket number and date | The ticket's identity | Keeps deliveries in order and auditable |
Which dimensions does the board foot use?
The board-foot formula uses the nominal dimensions, not the actual dressed dimensions. A board foot is the volume of a board 1 foot long, 1 foot wide, and 1 inch thick, which is 144 cubic inches.
Board feet = thickness (in) × width (in) × length (ft) ÷ 12
The American Softwood Lumber Standard PS 20 defines nominal size as the label designation for lumber size categories and states that it does not reflect the dressed size. A dry 2x4 is surfaced to 1-1/2 by 3-1/2 inches. The ticket therefore tallies a 2x4 at 2 by 4 inches. Measuring the dressed board with a tape gives a smaller number, and that smaller number does not mean the ticket is wrong.
How do you check the tally total?
Multiply the per-piece board feet by the piece count and compare the result with the ticket's line total.
Worked example: dimensional lumber
A ticket line shows 8 pieces of 2x4, 12 feet long.
- Per-piece board feet: 2 × 4 × 12 ÷ 12 = 8.
- Line total: 8 × 8 = 64.
Result: the line should tally 64 board feet. A ticket showing 64 matches the nominal-dimensions formula.
Recheck any ticket line in the Board Foot Calculator before approving it: enter the ticket's billed dimensions and compare the result with the line total.
How does the tally handle odd widths and lengths?
Hardwood tally rules round measurements before the board-foot math. The NHLA rules, condensed by the American Hardwood Export Council, round board widths to the nearest whole inch, with widths falling exactly on the half inch alternated up and down. Lengths are always rounded down to the nearest whole foot.
Worked example: hardwood tally rounding
A 4/4 board measures 8-1/4 inches wide and 10 feet 6 inches long.
- Tally width: 8-1/4 in rounds to 8 in.
- Tally length: 10 ft 6 in rounds down to 10 ft.
- Tallied board feet: 1 × 8 × 10 ÷ 12 = 6.6667, about 6.67.
Result: the ticket tallies about 6.67 board feet for this board. The dropped quarter inch and 6 inches follow the tally rule. They are not a shortage.
Hardwood thickness uses quarters of an inch: 4/4 means 1 inch, 6/4 means 1-1/2 inches, and 8/4 means 2 inches. These are nominal, roughsawn dimensions, not surfaced dimensions.
What does MBF mean on the price line?
MBF means one thousand board feet. Softwood lumber is commonly priced per MBF. A per-MBF price cannot be compared directly with a per-lineal-foot price.
Price per lineal foot = (price per MBF ÷ 1000) × board feet per lineal foot
Write $465.00 per MBF or $0.62 per lineal foot rather than recording $465 or $0.62 alone. A price without its unit cannot be checked later.
Worked example: ticket price conversion
A ticket prices 2x8 lumber at $465.00 per MBF.
- Price per board foot: 465 ÷ 1000 = $0.465.
- Board feet per lineal foot of 2x8: 2 × 8 ÷ 12 = 1.3333.
- Price per lineal foot: 0.465 × 1.3333 = 0.61998, about $0.62.
Result: the 2x8 costs about $0.62 per lineal foot at this ticket price. This is a price conversion fixture for the stated price; use the ticket's actual price for a real comparison.
Common supplier-ticket mistakes
- Checking the tally with actual dressed dimensions instead of nominal dimensions.
- Reading lineal feet as board feet, or board feet as lineal feet.
- Comparing a per-MBF price with a per-lineal-foot price without converting.
- Reading 4/4 as 4 inches instead of 1 inch nominal.
- Treating rounded tally widths and dropped fractional feet as a shortage.
- Combining ticket lines of different sizes, species, or grades into one check.
- Filing the ticket without the ticket number, date, size, and piece count.
Sources and scope
- American Hardwood Export Council, Grading sawn lumber - Measurement: board foot definition (1 ft x 1 ft x 1 in), the board-foot formula, and NHLA tally rounding rules.
- American Softwood Lumber Standard PS 20, section 2.16: nominal size is the label designation and does not reflect the dressed size; a dry 2x4 is surfaced to 1-1/2 x 3-1/2 in.
- Hardwood Industries board footage calculator notes: hardwood thickness in quarters of an inch as nominal dimensions; NHLA length rounding.
- Fastmarkets Lumber Methodology Guide, June 2026: softwood lumber priced per thousand board feet (MBF).
- UCFP Wood Purchasing handbook: piece tally as the most accurate tally method; block scale as a quick estimate.
- NIST Handbook 44, 2026 Appendix C: inch, foot, and millimetre relationships.
Scope: this page explains how to read the ticket fields and check the board-foot tally. The governing contract, supplier record, grading rules, and responsible qualified people control the accepted tally, grade, and final project quantity. Log-scale rules such as Doyle, Scribner, and International 1/4-inch estimate lumber yield from logs and are outside this page's scope.
Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.
Next, browse the Material Conversion hub for quantity tools, or read the aggregate supplier-ticket guide when a ticket records weight instead of board feet.