For homeowners, trades and estimators

Construction calculators and material estimates.

Use metric or imperial measurements to estimate material quantities. Each tool shows its formula, unit conversions, assumptions, and rounding.

Available calculators

Choose the quantity you need.

Open a calculator for gravel, sand, or trench excavation. Each tool supports metric and imperial measurements.

01 Calculator

Calculate strip footing concrete

Measured pour volume and waste-adjusted planning volume

Open calculator
02 Calculator

Calculate pier footing concrete

Per-pier breakdown, measured total and waste-adjusted planning volume

Open calculator
03 Calculator

Calculate foundation wall concrete

Measured wall volume, planning volume, and per-segment breakdown

Open calculator
04 Calculator

Calculate footing excavation volume

Per-pit volume, total excavated volume, loose spoil volume, and estimated truck loads

Open calculator
05 Calculator

Convert aggregate weight and volume

Converted quantity with the entered density, unit, and material condition recorded

Open calculator
06 Calculator

Calculate asphalt volume and tonnage

Compacted volume, entered-density mass, supplier-rounded order and optional truck loads

Open calculator
07 Calculator

Calculate basement slab concrete

Interior slab, pads, sump deduction, and supplier-rounded order volume

Open calculator
08 Calculator

Calculate lumber board feet

Measured board feet, planning total, and optional order cost

Open calculator
09 Calculator

Calculate bond beam grout volume

Measured grout volume, planning volume, and optional whole packages

Open calculator
10 Calculator

Calculate bricks for walls and openings

Net wall area, base bricks, bond correction, allowance and supplier pack rounding

Open calculator
11 Calculator

Calculate compost volume and bags

Direct-layer or mix-component compost volume, planning quantity, and optional whole packages

Open calculator
12 Calculator

Calculate concrete volume and whole bags

Measured and planning volume, exact package quotient, whole bags, and purchased mixed capacity

Open calculator
13 Calculator

Calculate concrete for beams

Cross-section area, volume per beam, total concrete, planning volume and whole packages

Open calculator
14 Calculator

Calculate concrete blocks for walls and openings

Gross, opening, and net area; base units; allowance; whole standard units; and module layout ratios

Open calculator
15 Calculator

Calculate concrete for columns

Cross-section area, volume per column, total concrete, planning volume, and whole packages

Open calculator
16 Calculator

Calculate countertop volume

Measured and planning countertop volume, with backsplash, edge, sink deduction, and whole bags

Open calculator
17 Calculator

Calculate concrete footing volume

Section volumes, overlap deduction, measured total and planning volume

Open calculator
18 Calculator

Calculate concrete overlay quantity

Measured and planning overlay volume, coats, whole bags, and coverage per bag

Open calculator
19 Calculator

Calculate concrete for post holes

Gross hole volume, post displacement, net concrete, planning volume, and whole packages

Open calculator
20 Calculator

Calculate concrete slab volume

Plan area, uniform slab volume, thickened edge, measured total and planning volume

Open calculator
21 Calculator

Calculate concrete for stairs

Measured and planning volumes, component breakdown, whole-package count

Open calculator
22 Calculator

Convert a concrete quantity between volume, weight, and bag units

Volume equivalents plus weight and bag numbers tied to your stated assumptions

Open calculator
23 Calculator

Calculate concrete for walls

Gross wall volume, opening deduction, net concrete, planning volume and whole packages

Open calculator
24 Calculator

Convert a jobsite measurement between metric and imperial units

Converted value plus every equivalent in the quantity type, with the exact definition used

Open calculator
25 Calculator

Convert coverage to purchase units

Net quantity, demand, exact and purchase units by product line

Open calculator
26 Calculator

Calculate curb-and-gutter concrete

Measured volume, planning volume, and cross-section area

Open calculator
27 Calculator

Calculate cut and fill volume

Cut volume, fill volume, net balance, and optional swell and shrinkage stages

Open calculator
28 Calculator

Calculate straight deck-board rows and stock boards

Rows, linear length, row-plan boards and pooled lower bound

Open calculator
29 Calculator

Calculate drainage gravel around a pipe

Gross trench zone, pipe displacement, placed gravel, supplier order, and optional mass

Open calculator
30 Calculator

Calculate driveway base and surface gravel

Separate placed, loose-basis, supplier-rounded, and optional mass results for 2 driveway layers

Open calculator
31 Calculator

Calculate dry well pit storage and stone order

Gross pit volume, effective storage, and loose stone order

Open calculator
32 Calculator

Calculate drywall area and sheet layout checks

Net area, lower bound, horizontal and vertical grids

Open calculator
33 Calculator

Calculate drywall corner-bead pieces and packages

Complete-run cuts, stock pieces, allowance, matching stock and packages

Open calculator
34 Calculator

Calculate drywall joint compound packages

Base compound, allowance, whole containers and package remainder

Open calculator
35 Calculator

Calculate drywall screw quantities and boxes

Base screws, allowance, usable stock, purchase count and whole boxes

Open calculator
36 Calculator

Calculate drywall tape rolls

Joint tape length, allowance, whole rolls and roll remainder

Open calculator
37 Calculator

Calculate expansion-joint materials

Selected slab-edge length, sealant volume, whole packages, filler length, and whole rolls

Open calculator
38 Calculator

Calculate fill dirt volume

In-place and loose-order volume for uniform or linearly changing fill, plus optional mass

Open calculator
39 Calculator

Calculate flooring area, pieces and boxes

Net area, allowance, whole pieces, boxes and box surplus

Open calculator
40 Calculator

Calculate flowable fill volume

Net trench volume, planning volume, order quantity, and mixer loads

Open calculator
41 Calculator

Calculate foundation backfill volume

Net placed backfill, excavation volume, and loose order quantity

Open calculator
42 Calculator

Calculate foundation drainage gravel

Placed ring volume, pipe deduction, drain perimeter, supplier order, and optional mass

Open calculator
43 Calculator

Calculate a full French drain system quantity

Excavation, net stone, cap, fabric, fall, and supplier-rounded stone order

Open calculator
44 Calculator

Calculate grade beam concrete

Measured and planning concrete volume, plus optional whole-package counts

Open calculator
45 Calculator

Calculate gravel volume

Measured area and volume, planning allowance, and optional supplier-density mass

Open calculator
46 Calculator

Calculate tile grout packages and joint volume

Measured and planning area, whole packages, package surplus, joint share and theoretical joint volume

Open calculator
47 Calculator

Calculate ICF blocks

Courses, layout and order block counts, and concrete core volume

Open calculator
48 Calculator

Calculate mortar bags for brick or block

Base and planning bag ratios, whole bags, purchased unit capacity, package surplus and dry product mass

Open calculator
49 Calculator

Calculate mulch volume and bags

Cubic metres or cubic yards, net refresh depth, planning volume, and optional whole packages

Open calculator
50 Calculator

Calculate wall and ceiling paint containers

Net area, coated area, litres or gallons, containers and surplus

Open calculator
51 Calculator

Calculate pavers and full bundles

Net paved area, allowance, whole pavers, bundles and bundle surplus

Open calculator
52 Calculator

Calculate bedding and joint sand for pavers

Paved area, bedding volume, supplier order, optional mass and packages, and joint-sand bags

Open calculator
53 Calculator

Calculate play sand for a sandbox

Net sandbox volume, planning volume, optional mass, and whole packages

Open calculator
54 Calculator

Calculate approved pool-base sand

Round, racetrack-oval, rectangular, or stated-area base volume with optional mass and packages

Open calculator
55 Calculator

Calculate ready-mix order volume and loads

Measured and planning volume, supplier-rounded order, commercial-rule addition, and optional load split

Open calculator
56 Calculator

Calculate a rectangular rebar grid

Directional bar counts, actual spacing, installed length, lap-adjusted length, and stock bounds

Open calculator
57 Calculator

Calculate roof area and package quantities

Sloped area, roofing squares, packages and surplus

Open calculator
58 Calculator

Calculate sand volume and packages

Measured and planning volume, optional mass, and whole packages from documented product inputs

Open calculator
59 Calculator

Calculate shotcrete volume

Measured area, placed volume, and rebound-adjusted order volume

Open calculator
60 Calculator

Calculate sloped trench volume

Top width, section area, bank volume, and loose planning volume

Open calculator
61 Calculator

Convert soil bags to cubic yards

Total volume in cubic yards, cubic feet, cubic metres, and litres, plus optional total weight

Open calculator
62 Calculator

Calculate stockpile volume

Loose volume, implied side-slope angle, and optional mass

Open calculator
63 Calculator

Calculate swale ditch volume

Section area, bank volume, and loose planning volume

Open calculator
64 Calculator

Calculate tile adhesive coverage and bags

Net and planning area, exact package ratio, whole bags, purchased capacity and package surplus

Open calculator
65 Calculator

Calculate floor or wall tiles and cartons

Net tile area, allowance, whole tiles, cartons and carton surplus

Open calculator
66 Calculator

Calculate topsoil volume and bags

Placed and loose-delivery volume, final planning quantity, and optional whole packages

Open calculator
67 Calculator

Calculate trench excavation volume

In-place volume, loose planning volume, and estimated loads

Open calculator
68 Calculator

Calculate wall-plate lumber and pieces

Bottom and top lengths, whole pieces, stock deduction and rounded surplus

Open calculator
69 Calculator

Calculate wall-stud layout and quantity

Field positions, closing studs, approved extras, allowance and stock deduction

Open calculator
  • Open accessUse current tools immediately.
  • Metric + imperialUnits remain explicit.
  • Browser calculationInputs stay in the active page.
  • Visible methodFormula, assumptions, and sources are shown.

Working tool 01

Calculate gravel volume.

Enter metric or imperial dimensions. Add a planning allowance or supplier bulk density only when your project records support that value.

Converted quantity

Enter a quantity and density

Secondary equivalent–
Input entered–
Density used–
Material condition–

Volume = weight ÷ bulk density

The converter uses only the density you entered. Verify the product, condition, and date behind that number before ordering.

The full page includes the formula, worked example, measurement guidance, limitations, and technical sources.

Open full calculator guide

Latest blogs

Read the latest blogs.

Fresh guides on measurement, conversion, and ordering. The full library holds every published article.

A site worker in a yellow hard hat and high-visibility vest writing on a clipboard beside a fresh pile of dark bulk mulch,…
blog 01

How to Read a Supplier Ticket for Coverage-to-Purchase Conversion

Read a supplier ticket for bagged or bulk coverage products: check the product identity, the stated coverage per unit, the delivered quantity and its unit, then convert the delivered quantity into coverage and reconcile it against the measured plan.

Read blog
A contractor in a white hard hat and yellow high-visibility vest checking stacked tile adhesive bags on a pallet beside a…
blog 02

Ordering with a Coverage-to-Purchase Converter: Avoiding Unit Mix-Ups

Turn a coverage conversion into a correct order: match area and rate units, apply coats and depth, use the label's conservative coverage end, and round up to the selling increment.

Read blog
A construction worker in a white hard hat and yellow high-visibility vest kneels on a partially tiled floor, holding a…
blog 03

Coverage-to-Purchase Converter Mistakes That Shorten or Swell an Order

Seven input mistakes that make a coverage-to-purchase conversion order too little or too much, from wrong depth rows to one-sided areas and borrowed rates.

Read blog
A construction worker in a white hard hat and yellow high-visibility vest studies a clipboard holding a hand-drawn room…
blog 04

Coverage-to-Purchase Converter vs Rule-of-Thumb Guessing

Run the coverage-to-purchase converter and remembered coverage rules on the same paint and tile jobs: where '350 ft² per gallon' holds, where depth and coats break it, and the checks that keep a shortcut honest.

Read blog
A construction worker in a yellow hard hat and orange high-visibility vest kneels beside a pallet stacked with bags of tile…
blog 05

Coverage-to-Purchase Converter: What the Label Numbers Mean

Read the coverage number on a product label correctly: the area-per-unit rate, the depth it assumes, and theoretical vs practical coverage, before you buy.

Read blog
A construction worker in a white hard hat and yellow high-visibility vest kneels on a tiled floor, pressing a steel tape…
blog 06

A Worked Example: Coverage-to-Purchase Conversion

Follow a coverage conversion from measured floor and wall to bag count: net area, the data-sheet rate at its depth row, rounding up, and the reverse check.

Read blog

Calculation method

See each step used in the result.

Each result shows the measured quantity, added assumptions, rounding, and items that still need a project or supplier decision.

  1. 01Measure the geometry

    Split changing shapes into checkable sections and keep every dimension in one unit system.

  2. 02Control the assumptions

    Add density, swell, waste, compaction, or delivery increments only when a credible project source supports them.

  3. 03Review the result

    Keep rounding, limitations, formula scope, and the difference between measured quantity and supplier order visible.