Aggregate Converter Density Number Explained

Understand the bulk density number on the aggregate weight-volume converter: what the unit means, why state and moisture change it, and where your number should come from.

A truck weighbridge with its steel scale deck and a small office beside sorted stockpiles of crushed stone and gravel.
Weighbridges record weight. The density number decides how that weight converts to a volume, so check its state and unit before using it.

Every weight-to-volume conversion runs on a single number: the bulk density of the aggregate. Read that number wrong and the converter gives a confident wrong answer. This guide explains what the label number states, why one product has several valid numbers, and how to pick the right one.

What does the density number on the converter mean?

The number states the mass packed into one unit of volume of that aggregate in its stated condition, air spaces between the particles included. A label reading 1,500 kg/m³ loose means one loose cubic metre of that aggregate weighs 1,500 kg.

Weight = volume × bulk density

Volume = weight ÷ bulk density

ASTM C29/C29M defines bulk density (unit weight) as the mass per unit volume of aggregate in a compacted or loose condition, and its scope covers establishing mass and volume relationships for purchase agreements. The number is a measured property of the material, not a universal constant. Confirm it for the product and state you are converting.

Write the state and unit beside every density number.

Write 1,500 kg/m³ loose, dry basis rather than recording 1,500 alone. A number without its state and unit cannot be checked later.

Why does one product show several different numbers?

Bulk density changes with how the material is packed and how wet it is. Loose fill holds more air space than compacted material, so its number is lower. Water adds mass to the same pile, so a wet number reads higher than a dry one. Caterpillar publishes reference density tables with separate columns for each state for this reason.

Reference densities for common materials, by state (Caterpillar)
Material and conditionLooseBank or in place
Gravel, dry1,510 kg/m³ (2,550 lb/yd³)1,690 kg/m³ (2,850 lb/yd³)
Gravel, wet (1/4-2 in.)2,020 kg/m³ (3,400 lb/yd³)2,260 kg/m³ (3,800 lb/yd³)
Sand, dry loose1,420 kg/m³ (2,400 lb/yd³)1,600 kg/m³ (2,700 lb/yd³)
Sand, wet1,840 kg/m³ (3,100 lb/yd³)2,080 kg/m³ (3,500 lb/yd³)
Crushed stone1,600 kg/m³ (2,700 lb/yd³)2,670 kg/m³ (4,500 lb/yd³)
Topsoil950 kg/m³ (1,600 lb/yd³)1,370 kg/m³ (2,300 lb/yd³)

These are reference values, not project numbers. Caterpillar's footnote states that weight varies with moisture content, grain size, and degree of compaction, and that tests must be made to determine exact material characteristics. The table alone shows the range: the same loose gravel reads 1,510 kg/m³ dry and 2,020 kg/m³ wet, and loose crushed stone (1,600 kg/m³) is far below its in-place value (2,670 kg/m³). Picking the wrong row gives a wrong volume even when the arithmetic is perfect.

Use the gravel weight chart when you need a weight reference for a gravel order, and the bulk density and unit weight guide for the density basis behind these numbers.

How do you read the unit on the label?

The same material reads differently in different units. A fixture label of 1,500 kg/m³ loose becomes 93.6 lb/ft³ in imperial units (1,500 × 0.062428 = 93.64). The material did not change. Only the unit did.

Match the density unit to the weight unit you are converting from. A kg/m³ label expects kilograms or tonnes in; a lb/ft³ or lb/yd³ label expects pounds or tons in. Mixing units without converting is the fastest way to get an order-of-magnitude error.

Using the 1,500 kg/m³ loose fixture: 20 t = 20,000 kg, and 20,000 ÷ 1,500 = 13.33 m³ loose. That figure is a calculation fixture, not a recommended density. Use the supplier or project record for the real number.

Where should your number come from?

Use the most project-specific evidence available. A number copied from an unlabeled online table carries no material, state, or moisture information.

Evidence order for a converter density number
EvidenceWhat to confirmMain limitation
Supplier or plant recordProduct code, material state, moisture basis, units, and dateMay describe only one plant or product
Project test per ASTM C29/C29MLoose or compacted condition, moisture basis, and test dateApplies to the tested material and condition only
Recognized reference tableMaterial description, density state, units, table edition, and stated limitationsReference values require project verification

The supplier ticket guide explains how to read the weight side of the conversion: gross, tare, net, and the ton or tonne unit. This page covers the density side. Both must match in state and unit before a conversion is trustworthy.

How do you check a suspicious density number?

Compare it against a second state row for the same material. Three relationships almost always hold.

  • Loose reads lower than bank or compacted for the same material. Crushed stone at 1,600 kg/m³ loose against 2,670 kg/m³ in place is a large but valid gap.
  • Wet reads higher than dry for the same product and state. Dry loose sand at 1,420 kg/m³ against wet loose sand at 1,840 kg/m³ shows water's effect.
  • Moisture adds weight, not solid volume. A wet number should exceed the dry number by a modest margin, not double it.

If a number moves in the wrong direction, you have the wrong row. Check the state, the moisture note, and the product identity before using the figure.

Common converter label-reading mistakes

  • Using a compacted-state density for a loose stockpile, or the reverse.
  • Applying a dry-basis density to a wet delivered weight.
  • Reading lb/yd³ as lb/ft³. One cubic yard is 27 cubic feet, so the two numbers differ by a factor of 27.
  • Treating one reference number as universal across products, plants, and seasons.
  • Copying a density from an unlabeled online table with no stated state.
  • Combining one product's density with another product's weight.
  • Recording a converted volume without the density, state, and unit that produced it.

Sources and scope

Scope: this page explains how to read and check the density number used in a weight-volume conversion. The governing supplier record, project drawings, local weights-and-measures rules, and responsible qualified people control the accepted density, moisture basis, and final project quantity.

Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.

Run the conversion with the Aggregate Weight-Volume Calculator once the density number is confirmed. Next, read the supplier ticket guide to check the weight side of the conversion, or return to the Material Conversion hub.