Board Foot: What It Is and How to Calculate It

Learn the board-foot formula, work two checked examples, see why nominal dimensions control the tally, and convert BF to cubic metres.

A carpenter's hands stretching a steel tape measure along a stack of rough-sawn lumber boards resting on wooden sawhorses…
Tape-measure checks what actually arrived; the billed board footage uses the nominal size on the ticket.

You need the board footage before you can check a lumber quote, compare two yards, or turn a cut list into an order. A board foot is the lumber trade's volume unit, and one formula covers every board.

What is a board foot?

A board foot is the volume of a board 1 foot long, 1 foot wide, and 1 inch thick. The American Hardwood Export Council defines it this way for hardwood lumber. Common abbreviations are BF, BDFT, and FBM, and 1,000 board feet is written as MBF.

By arithmetic, 1 board foot equals 144 cubic inches, or 1/12 of a cubic foot.

How do you calculate board feet?

Board feet = thickness (in) × width (in) × length (ft) ÷ 12

The divisor is 12 because the length is measured in feet while the thickness and width are measured in inches. Multiplying gives the volume in inch-square-feet; dividing by 12 converts it to the 144-cubic-inch board-foot unit. When every dimension is in inches, divide by 144 instead and the answer is the same.

Worked example: dimensional softwood

An order lists 6 pieces of 2x8, each 12 feet long, at nominal size.

  1. Per-piece board feet: 2 × 8 × 12 ÷ 12 = 16.
  2. Order total: 16 × 6 = 96.

Result: the order contains 96 board feet.

Worked example: hardwood in 4/4

A 4/4 board measures 7-1/4 inches wide and 9 feet 8 inches long. Hardwood thickness is written in quarters of an inch, so 4/4 means 1 inch nominal. The NHLA tally rules, condensed by the American Hardwood Export Council, round board widths to the nearest whole inch and always round lengths down to the nearest whole foot.

  1. Tally width: 7-1/4 in rounds to 7 in.
  2. Tally length: 9 ft 8 in rounds down to 9 ft.
  3. Board feet: 1 × 7 × 9 ÷ 12 = 5.25.

Result: the board tallies 5.25 board feet. The dropped quarter inch and 8 inches follow the tally rule; they are not a shortage.

Check your own numbers with the Board Foot Calculator, which accepts imperial or metric dimensions and keeps the planning allowance separate from the measured total.

Which dimensions does the formula use?

Use the nominal size for purchase checks. The American Softwood Lumber Standard PS 20 defines nominal size as the label designation for lumber size categories and states that it does not reflect the dressed size. A dry 2x4 is surfaced to 1-1/2 by 3-1/2 inches, so a tally computed from tape-measured dressed boards gives a smaller number that does not match the yard's ticket.

Hardwood thickness in quarters is also nominal: 4/4 is 1 inch, 6/4 is 1-1/2 inches, and 8/4 is 2 inches, all roughsawn. One more tally limit matters for kiln-dried stock: lumber sold on the gross (green) tally shrinks in the kiln, and the buyer can expect to receive about 7% less board feet.

Use the seller's billed size for the check.

Tape-measure what arrived to confirm the load, but compute board feet from the nominal size on the ticket. The supplier-ticket guide shows the full field-by-field check.

How is a board foot different from a square foot or a lineal foot?

Each unit answers a different buying question. The AHEC measurement page gives the connection: surface measure in square feet equals width (in) × length (ft) ÷ 12, and board feet equal surface measure × thickness (in).

Lumber selling units and what each measures
UnitMeasuresOne unit isTypical use
Board foot (BF)Volume1 ft × 1 ft × 1 inHardwood, rough lumber, slabs
Square footArea12 in × 12 in of surfaceFlooring, plywood, sheet goods
Lineal footLength only12 in of board lengthTrim, molding, some dimensional lumber

A square foot leaves thickness out, so it cannot price boards of different thickness fairly. A lineal foot leaves out width and thickness both. Use board feet when the wood volume is what changes the price.

What does MBF mean, and what is a board foot in metric?

MBF means 1,000 board feet. The AHEC conversion factors connect board feet to cubic metres: 1,000 BF equals 2.36 m³, and 1 m³ equals 424 BF.

Board feet = thickness (mm) × width (mm) × length (m) ÷ 2359.74

Worked example: metric dimensions

A board measures 38 mm thick, 140 mm wide, and 2.4 m long.

  1. Multiply: 38 × 140 × 2.4 = 12,768.
  2. Divide: 12,768 ÷ 2359.74 = 5.41.

Result: the board contains about 5.41 board feet. The divisor 2359.74 comes from the exact NIST unit relationships: 1 inch = 25.4 mm and 1 foot = 0.3048 m.

When does the board foot not apply?

Log-scale rules such as Doyle, Scribner, and International 1/4-inch estimate how much lumber a log will yield. They answer a sawmill question, not a board tally, and they sit outside this guide's scope. Sheet goods such as plywood sell by the sheet or the square foot because their thickness is fixed by the product. A gross-tally kiln-dried purchase also delivers fewer board feet than the ticket states, per the shrinkage allowance above.

Common board-foot mistakes

  • Checking a nominal-basis tally with tape-measured dressed dimensions.
  • Reading square feet or lineal feet as board feet, or the reverse.
  • Reading 4/4 as 4 inches instead of 1 inch nominal.
  • Forgetting to multiply by the piece count.
  • Mixing units: length in inches with the ÷ 12 formula, or length in feet with ÷ 144.
  • Treating rounded tally widths and dropped fractional feet as a shortage.

Sources and scope

Scope: this page explains the board-foot unit and its computation for lumber purchases. The governing contract, supplier record, grading rules, and responsible qualified people control the accepted tally, grade, and final project quantity.

Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.

Next, check a real ticket with the board-foot supplier-ticket guide, compare billed and dressed sizes in the deck board size reference, or browse the Material Conversion hub for quantity tools.