A Worked Example: Board Foot Tally for a Shop Bench

Follow a complete board-foot tally from a cut list to a verified total: every line calculated, then three independent checks confirm the 60.67 BF result.

A stack of rough-sawn lumber boards on wooden sawhorses at an outdoor lumber yard, with a yellow tape measure extended…
Read the nominal size at the board end, tally each line with the formula, and verify the total before ordering.

One board-foot example is easy to follow but hard to reuse. This page works one complete tally from a cut list to a verified total, showing every line so you can run the same method on your own parts list.

What does the example project need?

The project is a shop bench with four lines in the cut list. All sizes are nominal: the label sizes the yard tallies, not the tape-measured size of the dressed board. A 2x4 on the ticket bills on 2 by 4, even though the planed board tapes about 1.5 by 3.5 inches. The board-foot guide covers the definition and the nominal rule in full.

Shop bench cut list
LineQuantityNominal size
Legs42x4 x 3 ft
Long rails42x4 x 4 ft
Slats61x6 x 4 ft
Top boards32x10 x 6 ft

How do you tally each line?

The formula is thickness in inches times width in inches times length in feet, divided by 12, times the piece count.

BF = thickness (in) x width (in) x length (ft) / 12 x pieces

Legs: 2 x 4 x 3 / 12 = 2.00 BF per board. Four boards give 8.00 BF.

Long rails: 2 x 4 x 4 / 12 = 2.67 BF per board. Four boards give 10.67 BF.

Slats: 1 x 6 x 4 / 12 = 2.00 BF per board. Six boards give 12.00 BF.

Top boards: 2 x 10 x 6 / 12 = 10.00 BF per board. Three boards give 30.00 BF.

Add the line totals: 8.00 + 10.67 + 12.00 + 30.00 = 60.67 BF. The unrounded total is 60.6667 BF. Round the reported total only. Rounding the lines first would hide board feet from the sum.

How do you verify the total?

Three independent checks confirm the tally. Run at least one before ordering.

A fourth check runs the same numbers through the Board Foot Calculator, which keeps full precision through the multiplication and converts metric entries exactly.

Check 1: run one board through the all-inches form

Enter the length in inches and divide by 144 instead of 12.

BF = thickness (in) x width (in) x length (in) / 144

A top board is 2 x 10 x 72 / 144 = 1,440 / 144 = 10.00 BF. The two forms must agree. When they disagree, the length unit and the divisor are the first suspects.

Check 2: subtotal by thickness

Add the 2-inch stock separately from the 1-inch stock, then add the subtotals. 2-inch stock: 8.00 + 10.67 + 30.00 = 48.67 BF. 1-inch stock: 12.00 BF. The sum is 60.67 BF, matching the line total. A mismatch points at the wrong line.

Check 3: cross-check one board in cubic inches

One board foot equals 144 cubic inches. A top board holds 2 x 10 x 72 = 1,440 cubic inches. Dividing by 144 gives 10.00 BF, the same figure the formula produced.

Where does the tally go next?

Treat 60.67 BF as the net footage for this project. Ordering adds the allowance decision and rounding up to whole boards on the supplier's selling basis. The ordering guide walks through that step, and the supplier-ticket guide shows how to check the tally when the load arrives.

Sources and scope

Scope: this page demonstrates the tally method on an author's own worked example. The governing contract, supplier record, grading rules, and responsible qualified people control the accepted tally, grade, and final project quantity. Log-scale rules such as Doyle, Scribner, and International 1/4-inch estimate lumber yield from logs and are outside this page's scope.

Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.

Next, read the ordering guide to turn net footage into a supplier order, or return to the Material Conversion hub.