Measure combined curb and gutter as one cross-section times one run length. Five readings give the volume: run length, curb thickness, curb height, gutter width, and flag thickness. Take them from the governing detail and check them in the field before you order.
What do you measure on curb and gutter?
Record these five readings before any calculation. Measure each one twice and write both readings on the record.
| Reading | How to take it | What it fixes |
|---|---|---|
| Run length | Along the curb line, broken at joints, openings, and section changes | Volume |
| Curb thickness | Front to back across the curb, at the top of the gutter slab | Stem area |
| Curb height | From the top of the gutter slab to the top of the curb | Stem area |
| Gutter width | From the face of the curb to the outer edge of the gutter | Flag area |
| Flag thickness | Thickness of the gutter slab, at the flow line unless the detail states another point | Flag area |
Total combined width is curb thickness plus gutter width. For a 6 in curb and a 24 in gutter, total width is 30 in. Write the total width on the record so a reviewer can check it against the detail.
Take the section from the governing standard detail or drawings. Dimensions vary by project, so a figure from another job does not prove your section.
How do you turn the readings into volume?
Split the cross-section into two rectangles: the curb stem on top and the full-width flag below it. Add the two areas, then multiply by the run length.
Curb stem area = curb thickness x curb height
Flag area = total combined width x flag thickness
Total section area = curb stem area + flag area
Volume = total section area x run length
Volume in cubic yards = volume in cubic feet / 27
Check the section with a second split. A full-height curb rectangle plus a gutter-only rectangle must give the same total area.
Check: total section area = curb thickness x (flag thickness + curb height) + gutter width x flag thickness
Use one unit for every input. Convert inches to feet before multiplying when the result must be cubic feet. One cubic foot holds 1,728 cubic inches, and one cubic yard holds 27 cubic feet.
Worked example: one straight run
A straight run measures 120 ft. The curb is 6 in thick and 6 in high above the gutter slab. The gutter is 24 in wide beyond the curb face. The flag is 6 in thick.
- Total width: 6 + 24 = 30 in = 2.5 ft. Curb thickness 6 in = 0.5 ft. Curb height 6 in = 0.5 ft. Flag thickness 6 in = 0.5 ft.
- Stem area: 0.5 x 0.5 = 0.25 ft2.
- Flag area: 2.5 x 0.5 = 1.25 ft2.
- Total section area: 0.25 + 1.25 = 1.50 ft2.
- Check: 0.5 x (0.5 + 0.5) + 2 x 0.5 = 0.5 + 1.0 = 1.50 ft2. The two splits agree.
- Volume: 1.50 x 120 = 180 ft3. In yards: 180 / 27 = 6.6667 yd3, shown as 6.67 yd3 measured.
Result: the run needs 180 ft3 of concrete by geometry, or 6.67 yd3 measured, before any separate allowance.
Worked metric check
A second run measures 30 m. Curb thickness is 0.15 m, curb height is 0.15 m, gutter width is 0.60 m, and flag thickness is 0.15 m.
- Total width: 0.15 + 0.60 = 0.75 m.
- Stem area: 0.15 x 0.15 = 0.0225 m2. Flag area: 0.75 x 0.15 = 0.1125 m2. Total: 0.135 m2.
- Volume: 0.135 x 30 = 4.05 m3. In yards: 4.05 x 1.30795 = 5.297 yd3, about 5.30 yd3.
- Check: 0.15 x (0.15 + 0.15) + 0.60 x 0.15 = 0.045 + 0.09 = 0.135 m2. The two splits agree.
How do you check the section against the governing detail?
Use the detail's section area when the detail gives one. Many agency drawings tabulate volume per linear foot for each standard section, so the detail may already state the figure for your width and depth. Tennessee DOT's standard drawing for 6-inch combined curb and gutter lists volume per linear foot by total width and gutter depth. When the detail gives that figure, use it and keep the hand calculation as the check.
When the detail gives dimensions only, use the two-rectangle method above and record the detail name, revision, and section label beside the readings. A section copied from another project is not a substitute.
How do you measure runs that are not one straight length?
Break the run where the section, direction, or pour changes. Measure each part on its own line and add the volumes only at the end.
- Break at driveways, curb ramps, catch basin openings, and expansion joints. Measure each opening as its own section or leave it out of the main run and record the exclusion.
- Break where the section changes, such as a wider gutter at an inlet or a lowered curb at a ramp.
- Measure curves along the centerline arc, not as chords. A curved curb face must follow the contour of the curve. Tennessee DOT's standard drawing states that no chord sections are permitted on curved curbs.
- At a corner, count the corner square once. Measure each leg to the intersection of the face lines, or measure centerline lengths and note the corner treatment on the record.
For a curve with a 25 ft centerline radius and a 90 degree bend, the arc is 2 x 3.14159 x 25 x (90 / 360) = 39.27 ft. Use that arc as the run length for the curved part.
What about the slope of the gutter?
The two-rectangle method treats the top of the gutter slab as flat. Real gutter tops slope toward the flow line at the curb face. When the detail gives a section area or a volume per linear foot, that figure already carries the slope, so use it.
When you must hand-compute a sloped gutter, add a small triangle for the drop. The triangle applies to the gutter width only, not to the full combined width.
Slope triangle area = 0.5 x gutter width x gutter drop
Apply the sign by the point where flag thickness was measured. When flag thickness is the thickness at the flow line, the slab thickens toward the outer edge, so add the triangle. When flag thickness is the thickness at the outer edge, subtract it. When the detail does not state the measurement point, ask for it instead of guessing.
For a 24 in gutter with a 0.5 in drop from the outer edge to the flow line, the triangle is 0.5 x 2 x 0.041667 = 0.041667 ft2. Over a 120 ft run that adds 5.0 ft3, or 0.19 yd3, about 2.8 percent of the worked example. Small, and worth recording when the pour is long.
What does a complete order record hold?
Keep measured volume, allowance, supplier rounding, and order volume on separate lines. A reviewer must be able to reverse the record back to the field readings.
| Line | What it holds |
|---|---|
| Measured volume | Section volume from the field readings, by part |
| Planning allowance | An added amount with a stated reason, such as form spread or spillage, never a universal percentage |
| Supplier rounding | Rounding to the supplier selling increment, such as a quarter yard |
| Order volume | Measured volume plus allowance, rounded to the selling increment |
Do not fold an allowance into the geometry. A hidden allowance makes the record impossible to check against the curb.
Common curb and gutter measurement mistakes
- Using total combined width as the gutter width, which counts the curb thickness twice.
- Measuring curb height from the bottom of the slab instead of the top of the gutter slab.
- Measuring gutter width from the back of the curb instead of the face of the curb.
- Measuring a curved run as a straight chord instead of the centerline arc.
- Counting a corner square in both legs.
- Mixing two sections into one run, such as a full-height section with a lowered ramp section.
- Leaving a driveway gap or catch basin opening in the main run, or leaving it out without recording the exclusion.
- Deducting joint filler thickness from the length. Joints are thin, and the detail's joint spacing does not change the section volume.
- Assuming one universal section, curb height, or gutter width.
- Rounding between steps, then rounding the final total again.
Safety and professional scope
Volume does not design the curb and gutter. Section, grades, drainage, reinforcement, joint spacing, finish, and traffic control come from the drawings, specifications, local rules, and qualified people.
Measure from a safe position and follow the project traffic-control plan. Do not step into a live traffic lane to take a reading, and keep clear of formwork loads, stored material, and edges. Tennessee DOT's standard drawing spaces contraction joints at 10 ft for its 6-inch combined section; your detail's spacing governs your run.
Confirm the adopted detail and its revision before cutting forms. Limits and details differ by agency and by edition, so a figure from another detail does not prove compliance.
Sources and scope
- NIST Handbook 44, 2026 Appendix C: General Tables of Units of Measurement, including the exact definitions behind the conversions used here (1 ft = 12 in, so 1 ft3 = 1,728 in3; 1 yd = 3 ft, so 1 yd3 = 27 ft3; 1 ft3 = 0.0283168 m3; 1 m3 = 1.30795 yd3).
- Tennessee DOT, Standard Drawing RP-VC-11, 6-inch Concrete Combined Curb and Gutter: standard sections by total width and gutter depth with volume per linear foot, 10 ft contraction joint spacing, and the rule that curved curb faces follow the curve contour with no chord sections.
Scope: the method turns stated field readings into a concrete volume for combined curb and gutter runs. The governing drawings, specifications, safety plan, supplier records, applicable law, and responsible qualified people control the accepted section, grades, drainage, joint spacing, traffic control, and final order quantity.
Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.
Next, check thickness against the Concrete Slab Thickness guide, or return to the Concrete Calculators hub.