One driveway, one complete bag count. This example starts with 24 ft by 16 ft measurements, deducts a planter, applies two coats at a stated coverage rate, and checks the result in metric units.
What does this worked example cover?
This example covers the quantity arithmetic for a bagged concrete overlay only. It does not choose the product or the thickness, and it does not judge whether the slab is a good overlay candidate.
All numbers below are stated fixture assumptions, not recommendations. Copy the method and the record layout, and replace every measurement with your own.
What are the starting measurements?
| Item | Fixture | Basis |
|---|---|---|
| Driveway slab | 24 ft x 16 ft | Tape measure along the slab edges |
| Planter to deduct | 4 ft x 3 ft | Tape measure around the planter opening |
| Overlay product | QUIKRETE Concrete Resurfacer #1131-40 | Product data sheet on file for the job |
| Stated coverage | About 17 ft² per 40 lb bag at 1/4 in | Data sheet figure at the fixture thickness |
| Coats | 2 | Data sheet's optional but recommended two-coat procedure |
What is the net coverage area?
Multiply first, then deduct, then double for two coats.
- Gross area: 24 × 16 = 384 ft².
- Planter deduction: 4 × 3 = 12 ft².
- Net area: 384 − 12 = 372 ft².
- Two coats: 372 × 2 = 744 ft² of coverage to buy.
How many bags does the arithmetic give?
Bags per coat = net area ÷ stated coverage per bag, rounded up
- Divide: 372 ÷ 17 = 21.8824.
- Round up to whole bags: 22 bags per coat.
- Two coats: 22 × 2 = 44 bags.
A second path confirms it: 744 ft² ÷ 17 = 43.7647, which also rounds to 44 bags. When both paths land on 44, the arithmetic is closed.
The order record adds its own allowance line. The fixture uses a reader-chosen 10 percent: 44 × 1.10 = 48.4, so 49 bags on the order.
The 44-bag arithmetic record and the 49-bag order record are two different lines. Never add a percentage to 372 ft² and call the result measured.
How does the result check in metric units?
Recompute from the fixture using independent conversions, and compare with the imperial path:
- Net area: 372 ft² × 0.092903 = 34.56 m².
- Stated coverage: 17 ft² × 0.092903 = 1.5794 m² per bag.
- Bags per coat: 34.56 ÷ 1.5794 = 21.88, so 22 bags.
- Two coats: 22 × 2 = 44 bags.
The metric path agrees with the imperial path at 44 bags. The conversion factor follows NIST Handbook 44 (2026), Appendix C.
Why is the stated coverage approximate?
The data sheet figure assumes a stated thickness on a sound surface. One bag covers 17 ft² at 1/4 in, which is 17 × (0.25 ÷ 12) = 0.354 ft³ of material. Low spots, a wavy surface, or a rough texture pull that same bag across more thickness, so the real coverage drops.
At minimum thickness with a broom or squeegee, the same product states about 90 ft² per bag. The spread between 17 ft² and 90 ft² shows how much thickness controls coverage. Keep the thickness you priced beside the bag count.
How do you section the workday?
The data sheet sections the work into areas no larger than about 144 ft² and works from one joint to the next. For this fixture: 372 ÷ 144 = 2.5833, so 3 sections of 124 ft² each.
Mix only what the 20-minute working time allows at 73°F. Let the first coat sit undisturbed 2 to 3 hours until it withstands foot pressure, then apply the second coat within 24 hours or repeat the pressure-wash prep. Keep the surface above 50°F for 8 hours after placement and out of freezing for 24 hours. Foot traffic waits 6 hours; vehicle traffic waits 24 hours.
Where does this number go next?
44 bags is the measured quantity, not the order. The order record adds the allowance line, the product name and data sheet revision, and the store details. The concrete overlay ordering guide turns this measured record into the order, and the measurement guide covers the tape-measure sequence when the slab is irregular.
Safety and professional scope
Quantity arithmetic does not judge whether a slab is sound enough for an overlay, choose the product, or set the surface preparation. Those decisions follow the product data sheet, the project documents, applicable law, site conditions, material testing, and responsible competent or qualified people.
For U.S. construction work, OSHA 29 CFR 1926.703 covers cast-in-place concrete workplace requirements. Other countries use their own workplace rules.
Sources and scope
- QUIKRETE, Concrete Resurfacer #1131-40 product data: approximately 17 ft² per 40 lb bag at 1/4 in; approximately 90 ft² at minimum thickness with broom or squeegee; optional but recommended two-coat procedure; layers not exceeding 1/4 in each; working time about 20 minutes at 73°F; section into areas no larger than about 144 ft²; temperature rules; foot traffic at 6 hours and vehicle traffic at 24 hours; second-coat timing and re-prep rule.
- NIST Handbook 44, 2026 Appendix C: metric and U.S. customary unit relationships used for the metric cross-check.
- OSHA 29 CFR 1926.703: U.S. occupational concrete-construction context.
Scope: the worked numbers are stated fixture assumptions used to demonstrate the arithmetic; they are not thickness, product, or order recommendations. The governing product data sheet, substrate condition, project documents, safety plan, applicable law, and responsible qualified people control the accepted project quantity.
Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.
Next, read the concrete overlay mistakes guide for the errors that break the arithmetic, or return to the Concrete Calculators hub.
Run the numbers with the Concrete Overlay Calculator, which turns the footprint, thickness, and coats into measured volume and whole bags.