One countertop run, one order record, every step shown. The run below is a straight slab with a single sink cutout. Follow the readings to the whole-bag order and you can check each line against your own run.
How much concrete does this countertop need?
The run measures 1.21875 ft3, shown as 1.22 ft3 net after the sink deduction. At a label yield of 0.60 ft3 per 80 lb bag, that is 3 whole bags. The rest of this page shows each step.
What are the readings for this run?
Take every reading from the finished outline, not the cabinet box, using the method in How to Measure for a Concrete Countertop Before You Cast. Measure each reading twice and write both on the record.
| Reading | Value | What it fixes |
|---|---|---|
| Finished length | 72 in, straight run | Gross volume |
| Finished depth | 25.5 in, 24 in cabinet depth plus 1.5 in front overhang | Gross volume |
| Slab thickness | 1.5 in, from the project detail | Volume, mix choice |
| Sink cutout | 24 in by 18 in, from the manufacturer cutout template | Volume deduction |
| Label yield | 0.60 ft3 per 80 lb bag | Whole-bag count |
| Starting water | 7 pt per bag | Batch water total |
How does the gross volume work out?
Multiply length by depth by thickness, all in inches, then divide by 1,728 to get cubic feet. The divisor is exact: 1 ft equals 12 in, so 1 ft3 equals 1,728 in3.
Gross volume in cubic inches = finished length x finished depth x slab thickness
Gross volume in cubic feet = volume in cubic inches / 1,728
- Gross: 72 x 25.5 x 1.5 = 2,754 in3.
- Then 2,754 / 1,728 = 1.59375 ft3, shown as 1.59 ft3 measured gross.
How much does the sink cutout remove?
Deduct every full-thickness cutout from the gross. The sink cutout volume is cutout length x cutout width x slab thickness, divided by 1,728 the same way.
Net measured volume = gross volume - sink cutout volume
- Sink cutout: 24 x 18 x 1.5 = 648 in3. Then 648 / 1,728 = 0.375 ft3.
- Net measured: 1.59375 - 0.375 = 1.21875 ft3, shown as 1.22 ft3 measured.
The cutout removes more than half a bag at the stated yield. Skip this line and the order comes up short.
How many bags does the net volume take?
Divide the net volume by the label yield and round up to whole bags. Never round the intermediate: keep the full 1.21875 in the division.
- Bags: 1.21875 / 0.60 = 2.03125, so 3 whole 80 lb bags. The bag count is a buy estimate before any project-specific allowance, which belongs to the order record.
- Batch water: 3 bags x 7 pt starting water = 21 pt total. Hold the balance of the water and add it only until the mix reaches the target slump, never past the data sheet cap of 5 to 7 in.
- Working time: the data sheet says to mix only what can be placed within 1 hour, so stage all 3 bags and the water before the first batch.
| Line | Value | Basis |
|---|---|---|
| Gross measured volume | 1.59 ft3 | 72 x 25.5 x 1.5 in, / 1,728 |
| Sink deduction | 0.375 ft3 | 24 x 18 x 1.5 in, full thickness |
| Net measured volume | 1.22 ft3 | 1.59375 - 0.375 = 1.21875 |
| Label yield | 0.60 ft3 per 80 lb bag | Manufacturer data sheet for the named mix |
| Order | 3 whole 80 lb bags | 1.21875 / 0.60 = 2.03125, rounded up |
| Starting water total | 21 pt | 3 x 7 pt, cap slump at 5 to 7 in |
Does the metric check agree?
A second run measures 1.83 m long, 0.65 m deep, and 0.038 m (38 mm) thick, with a 0.60 m by 0.45 m sink cutout. The metric label yield is 0.017 m3 per bag.
- Gross: 1.83 x 0.65 x 0.038 = 0.045201 m3, shown as 0.045 m3 measured gross.
- Sink cutout: 0.60 x 0.45 x 0.038 = 0.01026 m3.
- Net: 0.045201 - 0.01026 = 0.034941 m3, shown as 0.035 m3 measured.
- Bag check: 0.034941 / 0.017 = 2.055, so 3 bags. The two unit systems agree.
Which cross-checks catch the common errors?
Run at least one cross-check before you buy the mix. Each check below targets one error that changes the order. Concrete Countertop Quantity Mistakes catalogues the rest.
| Check | Arithmetic | Error it catches |
|---|---|---|
| Inches to feet | 72 x 25.5 x 1.5 = 2,754 in3, and 2,754 / 1,728 = 1.59375 ft3 | Forgetting the divide-by-1,728 step and ordering in cubic inches |
| Cutout size against gross | 0.375 ft3 is about 24 percent of 1.59375 ft3 | Skipping the sink deduction or measuring the rim instead of the template |
| Round-up check | 2.03125 bags rounds up to 3, never down to 2 | Rounding the bag count down and coming up short mid-pour |
| Metric parity | 0.034941 m3 is 1.23 ft3, within display rounding of 1.22 ft3 | A conversion or decimal error in the volume |
| Bag count against volume | 3 x 0.60 = 1.80 ft3 of yield covers 1.22 ft3 measured | Buying an exact-fit 2 bags when the math calls for a rounded-up 3 |
Safety and professional scope
Volume does not design the countertop. Slab thickness, reinforcement, cabinet support, seam positions, and the sink and faucet layout come from the project detail, the mix manufacturer's instructions, and qualified people. A precast slab is heavy, so plan the lift and the curing space before the pour.
Cement is caustic. Wear gloves, boots, and eye protection, keep dust out of the air you breathe, and wash skin contact with clean water. Keep the work area clear of trip hazards while forms are built and moved.
Sources and scope
- NIST Handbook 44, 2026 Appendix C: General Tables of Units of Measurement, including the exact definitions behind the conversions used here (1 ft = 12 in, so 1 ft3 = 1,728 in3).
- QUIKRETE, Countertop Mix No. 1106-80 data sheet: 80 lb bags, yield about 0.60 cu ft (0.017 m3) per bag, starting water about 7 pt (3.3 L), final 8 to 9 pt, recommended slump 5 to 7 in, do not exceed; mix only what can be placed in 1 hour.
Scope: this article works one straight run end to end: readings, gross and net volume, the sink deduction, a metric cross-check, and a whole-bag order at the named data sheet yield. Mix choice, ordering steps, and common mistakes are covered in the sibling articles linked below. The governing project detail, the mix manufacturer's instructions, supplier records, applicable law, and responsible qualified people control the specified mix, reinforcement, formwork, finish, curing, and final order quantity.
Review responsibility: Saleem Sial owns the published calculation, source, and editorial checks. Waseem Sial, External Reviewer and Engineer, remains listed for ongoing external review; no completed external-review date is claimed.
Next, take your own readings with the countertop measurement guide, choose the mix with the countertop mix guide, plan the buy with the countertop ordering guide, check the common errors with the countertop mistakes guide, or run the same run through the Concrete Countertop Calculator, or return to the Concrete Calculators hub.